Documents

Manchester Road Corridor Redevelopment

Timeline of Process and Notifications (PDF)

October 2021 Manchester Road Improvements - Bid Set and Construction Set

Bid Plan Document 1 (PDF)
Bid Plan Document 2 (PDF)
Bid Plan Document 3 (PDF)
Bid Plan Document 4 (PDF)
Bid Plan Document 5 (PDF)

June 2021 Manchester Road Improvements - Bid Plan Set

Bid Plan Document 1 (PDF)
Bid Plan Document 2 (PDF)
Bid Plan Document 3 (PDF)
Bid Plan Document 4 (PDF)
Bid Plan Document 5 (PDF)

September 2020 Deer Creek Flood Mitigation

Deer Creek Flood Mitigation Phase 2 60 Percent Drawings (PDF)
Deer Creek Flood Mitigation Phase 2 Information and Specs for Bidders (PDF)

August 2020 Deer Creek Greenway Connector

Deer Creek Greenway Connector 60% Draft Plans (PDF)
Deer Creek Greenway Connector Technical Specs (PDF)

April 2, 2020 Manchester Road Improvements

Manchester Road Improvements 100% Draft Plans - Plans (PDF)
Manchester Road Improvements 100% Draft Plans - Cross Sections (PDF)

Note: These plans do not include the connection of Van Mark Way to Dorothy via crossing Rogers Parkway, as presented and approved by the Board of Aldermen on March 2, 2020. 

August 2, 2019 CLOMR

Conditional Letter of Map Revision (CLOMR) from FEMA

May 2019 Maps: Proposed Floodplain Changes

Map of Proposed Changes in Floodplain for Deer Creek and Black Creek (PDF)

January 2019 Comprehensive Plan Supplement

Brentwood Comprehensive Plan Supplement 2019 (PDF)

May 4, 2018 Development Plan

Brentwood Redevelopment Corporation Development Plan (PDF)