Documents
Manchester Road Corridor Redevelopment
Timeline of Process and Notifications (PDF)
October 2021 Manchester Road Improvements - Bid Set and Construction Set
Bid Plan Document 1 (PDF)
Bid Plan Document 2 (PDF)
Bid Plan Document 3 (PDF)
Bid Plan Document 4 (PDF)
Bid Plan Document 5 (PDF)
June 2021 Manchester Road Improvements - Bid Plan Set
Bid Plan Document 1 (PDF)
Bid Plan Document 2 (PDF)
Bid Plan Document 3 (PDF)
Bid Plan Document 4 (PDF)
Bid Plan Document 5 (PDF)
September 2020 Deer Creek Flood Mitigation
Deer Creek Flood Mitigation Phase 2 60 Percent Drawings (PDF)
Deer Creek Flood Mitigation Phase 2 Information and Specs for Bidders (PDF)
August 2020 Deer Creek Greenway Connector
Deer Creek Greenway Connector 60% Draft Plans (PDF)
Deer Creek Greenway Connector Technical Specs (PDF)
April 2, 2020 Manchester Road Improvements
Manchester Road Improvements 100% Draft Plans - Plans (PDF)
Manchester Road Improvements 100% Draft Plans - Cross Sections (PDF)
Note: These plans do not include the connection of Van Mark Way to Dorothy via crossing Rogers Parkway, as presented and approved by the Board of Aldermen on March 2, 2020.
August 2, 2019 CLOMR
Conditional Letter of Map Revision (CLOMR) from FEMA
May 2019 Maps: Proposed Floodplain Changes
Map of Proposed Changes in Floodplain for Deer Creek and Black Creek (PDF)
January 2019 Comprehensive Plan Supplement
Brentwood Comprehensive Plan Supplement 2019 (PDF)