Construction work anticipated in the next two weeks on the Brentwood Bound Plan:
Demolition Phase 1B
- Marschel Wrecking will begin the demolition of the buildings at 8228 and 8130 Brentwood Industrial Drive on August 6..
- The Brentwood Fire Department will conduct training exercises at 8228 and 8130 Brentwood Industrial Drive.
Site Camera
See a live view of work on Brentwood Bound through the “Site Cameras” link on the top of the home page of www.BrentwoodBound.org.